Understanding a Temporary Vestibule

A temporary vestibule serves as an intermediary space between the outdoors and the interior of a building. Often used for added insulation and to reduce the ingress of cold air during colder months, a temporary vestibule can be a practical addition to businesses and homes alike. Below is a step-by-step guide to help you construct one.

Materials and Tools Needed

  • Measuring tape
  • PVC pipes or metal framing materials for structure
  • Heavy-duty plastic sheeting or canvas material for covering
  • Zip ties or metal brackets (depending on the frame material)
  • Velcro or zipper system for the entrance
  • Adhesive tape (duct tape or construction-grade)
  • Utility knife or scissors
  • Screwdriver and screws (if using metal framing)
  • Drill (if using metal framing)
  • Heavy-duty stapler (optional)
  • Weights or sandbags for stabilization

Planning the Vestibule

Before you begin building, you’ll need to plan the size and location for your vestibule. Measure the area where you will install the vestibule, keeping in mind that it needs to be large enough to comfortably enter and exit, but not so large that it’s difficult to heat.

Step 1: Designing the Frame

First, sketch a simple design for your vestibule. Decide on the dimensions and the shape — typically a rectangle or square. The frame can be constructed from PVC pipes or metal framing materials, which are both sturdy and easy to work with. Ensure the design will be strong enough to withstand wind and that it’s secured to the building and ground properly.

Step 2: Assembling the Frame

Cut your PVC pipes or metal materials to the appropriate lengths matching your design. Connect them using fittings for PVC or screws and brackets for metal materials. Assemble the frame so it forms a solid base and has vertical poles for the walls and a horizontal structure for the roof. Use connectors as needed to ensure stability.

Step 3: Attaching the Cover

Lay your covering material over the frame, making sure there’s enough excess to reach the ground and secure it to the base frame. Trim it as needed with a utility knife or scissors, allowing for a little overlap for securing it. Attach the material to the frame using zip ties or metal brackets. For added strength, especially if you’re using heavy-duty plastic sheeting, you can also use an industrial stapler to attach the plastic to the frame.

Step 4: Creating an Entrance

Cut a vertical line in the material where you want your door to be. Install a Velcro or zipper system along this line to create a sealable entrance. Make sure the seal is strong to prevent cold air from entering.

Step 5: Securing the Vestibule

Place weights or sandbags around the base of the vestibule to secure it against wind and other elements. If possible, anchor the structure to the side of the building to strengthen it further. Double-check all connections and seal any gaps with adhesive tape.

Step 6: Finishing Touches

Inspect your vestibule for any potential issues such as tears in the material or loose fittings. Make any necessary repairs or adjustments. You may also want to consider adding a small mat to keep the interior clean and even a light source if it will be used frequently at night.

Conclusion

Building a temporary vestibule can be a straightforward weekend project that provides immediate benefits in terms of energy efficiency and comfort. By following these steps, you can create a functional vestibule that will serve you well throughout the colder months.

As with any construction project, please ensure you adhere to local building codes and regulations, and if necessary, obtain any required permissions before starting your build.

How useful was this guide?

Leaving a rating and a comment is the best way to help us improve StepbyStepBOT. Please take a second to help us improve our service.

Average rating 5 / 5. Vote count: 1

No votes so far! Be the first to rate this post.

Leave a Reply

Your email address will not be published. Required fields are marked *